CAD Drawings

CAD Drawings

Wall To Wall – Single Protection

Wall To Wall – Double Protection – External Grout Method

Wall To Wall – Triple Protection

Wall To Slab – Single Protection

Wall To Slab – Double Protection – External Grout Method

Wall To Slab – Double Protection – Internal Grout Method

Wall To Slab – Triple Protection

Wall To Elevated Slab – Single Protection

Wall To Elevated Slab – Double Protection – Internal Grout Method

Wall To Elevated Slab – Double Protection – Internal Swelling Method

Wall To Elevated Slab – Double Protection – External Grout Method

Wall To Elevated Slab – Triple Protection

Tie Back Blockout – Double Protection External Grout Method

Surface Applied – Horizontal

Surface Applied – Vertical

Slab To Slab – Single Protection

Slab To Slab – Double Protection – Internal Swelling Method

Slab To Slab – Double Protection – External Grout Method

Slab To Slab – Triple Protection

Penetration – Triple Protection

Penetration – Pile Cap – Single Protection

Penetration – Pile Cap – Double Protection

Penetration – Pile Cap – Triple Protection

Penetration – External Grout Method

Penetration – Internal Swelling Method

Penetration – Tie Holes

Leak Repair – Pipe Penetrations

Leak Repair – Wall To Slab

Leak Repair – Slab To Slab

Leak Repair – Positive Negative

Expansion Joint – Heavy Duty Cover Plate Application

Expansion Joint – Joint Application

Expansion Joint – Deck To Wall Application

Expansion Joint – Angle Iron Application

Control Joint – Back Filled Wall

Control Joint – Blind Shoring Wall